Mitsubishi Galant

1990-2001 of release

Repair and car operation



Mitsubishi Galant
+ Identification numbers of the car
+ Controls
+ Options and routine maintenance
+ The engine
+ Cooling and heating systems
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Manual transmission
- Coupling and transmission a line
   Specifications
   Coupling - the general information and check of a condition of components
   Removal, check of a condition and installation of components of assemblage of coupling
   Removal, check of a condition and installation выжимного the bearing and a plug of deenergizing of coupling
   Check of a condition and replacement of the directing bearing
   Adjustment of a pedal of coupling
   Adjustment of a cable of a drive of coupling, removal and installation тросовой assemblages (models Mirage with тросовым a coupling drive)
   Removal and installation of the main cylinder of coupling
   Removal and installation of the executive cylinder of coupling
   Removal of air from a hydraulic path of a drive of deenergizing of coupling
   Removal and installation of power shafts
   Hinges of power shafts - the general information and service
   Condition check трансмиссионной lines
   Removal and installation карданного a shaft
   Replacement карданного the hinge
   Balancing карданного a shaft
   Removal and installation of assemblage of the central bearing карданного a shaft
   Removal and installation of back semiaxes (model AWD Galant on 1993 вып.)
   Removal and installation ступичной pins of a back axis, the wheel bearing and an epiploon
   Replacement of an epiploon of a leading gear wheel of back differential
   Removal and installation картер back differential (model AWD Galant on 1993 вып.)
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of assemblage of the central bearing карданного a shaft

Removal

 PERFORMANCE ORDER

1. Mark position of universal hinge Lobro (Lobro) concerning a connecting flange.
2. Turn out fixing bolts and separate the hinge from a flange.
3. Mark position of the central collar concerning the central section карданного a shaft, and position соединительно a flange - concerning back section.
4. Give самоконтрящиеся nuts and remove the central collar with a connecting flange.
5. Mark position of a forward arm of the central bearing concerning the central section of a shaft, back - concerning back section. Remove a basic arm of the central bearing.

Rubber pillows from an arm are not taken.

6. By means of a special stripper liberate from assemblage forward and back central bearings.


Installation

 PERFORMANCE ORDER

1. Fill in forward and back flutes of assemblage of the central bearing universal greasing, the same greasing натолкайте in sponges пыльника. Track, that the bearing has got to a flute of a rubber pillow of a basic arm.

Пыльник it is established by sponges towards landing labels on an arm.

2. Plant bearing assemblage on the central and back sections карданного a shaft, - track correctness of combination of landing labels.
3. Special, a part ремнабора, with greasing in regular intervals grease rubber уплотнители a connecting flange. Watching correctness of combination of landing labels, the central section of a shaft and a connecting flange, densely plant the bearing by a tightening самоконтрящихся nuts.
4. Screw and tighten bolts of fastening of hinge Lobro. Also check up assemblage on presence of signs of development of leaks through a protective cover and a connecting flange.