Mitsubishi Galant
+ Identification numbers of the car
+ Controls
+ Options and routine maintenance
+ The engine
+ Cooling and heating systems
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
- Manual transmission
+ 5-step manual box of a gear change (РКПП)
- Automatic transmissions (АТ)
The general information and functioning principle
Problem diagnostics АТ - the general information
The adjustments made without removal АТ from the car
Removal and pallet installation картера АТ
Removal, installation and adjustment of the gauge-switch of the permission of start
Removal and installation АТ
Major repairs АТ
+ Distributing box
+ Coupling and transmission a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
|
Removal and installation АТ
Details of installation АТ F4А51 on models Diamante, the left-side view behind (1 from 2)
Details of installation АТ F4А51 on models Diamante, the left-side view behind (2 from 2)
Models Diamante
| |
The definitive tightening of the fixture marked with an asterisk is made after lowering of the power unit. |
Removal
| |
| 1. Details of installation of assemblage АТ on models Diamante are shown on illustrations.
2. Disconnect SRS (safety pillows) (the Onboard electric equipment see the Head).
3. Поддомкратьте the car also establish it on props.
4. Remove forward wheels.
5. Remove a lateral cover and protection картера the engine.
6. Merge from картера transmissions ATF.
7. At a corresponding complete set of the car remove assemblage forward каталитического the converter.
8. Remove an exhaust pipe, the main muffler and assemblage каталитического the converter.
9. Liberate from assemblage of a rotary fist a tip of steering draught and a spherical support of the lever of a suspension bracket.
10. Отболтите the basic bearing of the left power shaft.
11. Hooking mount, liberate power shafts from transmission.
12. Remove assemblage of an air cleaner with the sleeve of an air inlet connected to it.
13. Disunite a socket of a plait of electroconducting of the engine.
14. On models with an active suspension bracket (Active-ECS) remove from transmission assemblage of the compressor and tie up its wire, - do not suppose повисания the compressor on an air hose.
15. At a corresponding complete set remove a basic arm of a jet emphasis of a suspension bracket of the power unit.
16. Disconnect from transmission a cable of a drive of a speedometer.
17. Release a fixing collar and disconnect from transmission a cable of a drive of a gear change.
18. Disconnect from картера transmissions hoses маслоохладителя, - at once закупорьте the open ends of hoses in order to avoid hit in dirt system.
19. Disconnect electroconducting from the gauge-switch of the permission of start, the gauge-switch of the servo-driver of a mode kickdown, the pulse generator, the gauge of temperature ATF and the electromagnetic valve of management of transmission switching.
20. Prop up transmission by a jack and remove an arm of a support of its suspension bracket.
21. Turn out three top bolts of fastening of transmission to the engine.
22. On models with 4WS remove a thermofilter of the oil pump 4WS and remove pump assemblage, - try not to suppose a tension of oil hoses.
23. On the models equipped with system Active-ECS disconnect a rod of the gauge of height of a suspension bracket from assemblage of the bottom control lever of a suspension bracket.
24. Turn out a bolt of fastening of the oxygen gauge to the right beam.
25. Remove starter assemblage.
26. Remove the basic arms blocking access to a back cover of a dome of transmission.
27. Remove covers of a dome/pallet of transmission.
28. Turn out bolts of fastening of a flexible disk to the rotation converter.
29. Turn out the bottom fixing bolts, separate transmission from the engine and take it from under the car. |
|
Installation
| |
| 1. Press transmission to the engine, screw fixing bolts and tighten them with demanded effort (75 H•м)
2. Screw bolts of fastening of the converter of rotation to приводному to a disk and tighten them with demanded effort (46 ÷ 53 H•м).
3. Establish dome/pallet covers картера transmissions.
4. Establish all acting in film for the purpose of providing of access to a back cover of transmission arms of support of a suspension bracket of the power unit.
5. Establish into place a starter.
6. Screw a bolt of fastening of a plait of electroconducting of the oxygen gauge to the right beam and tighten it with demanded effort (10 ÷ 12 H•м).
|
7. On models with Active-ECS connect a rod of the gauge of height of a suspension bracket to the bottom control lever. Adjust length of a rod And, - demanded value makes 269 ÷ 270 mm. |
8. At a corresponding complete set establish into place the pump 4WS and its thermofilter. Tighten bolts of fastening of the pump and its screen with demanded effort (24 H•м).
9. Screw three top bolts of fastening of transmission to the engine. Tighten bolts with demanded effort
(75 H•м).
|
|
One of the top bolts is used also for fastening of the tyre of grounding. |
10. Establish an arm of a support of a suspension bracket of transmission. Tighten fixture (bolts and nuts) support with demanded effort (70 H•м).
11. Connect electroconducting to the electromagnetic valve of management switching АТ, to the gauge-switch of the servo-driver of a mode kickdown, to the pulse generator, the gauge of temperature ATF and the gauge-switch of the permission of start (PNP).
12. Connect to transmission hoses маслоохладителя and fix them on the unions new collars.
13. Connect to transmission and fix a collar a cable of a drive of switching.
14. Connect to transmission a cable of a drive of a speedometer.
15. At a corresponding complete set establish an arm of a jet emphasis of a suspension bracket of the power unit and tighten a nut of its through bolt with effort 50 ÷ 60 H•м. Two remained bolts tighten with effort 22 H•м.
16. On models with Active-ECS establish into place assemblage of the air compressor and tighten bolts of its fastening with demanded effort (5 H•м).
17. Connect a contact socket of a plait of electroconducting of the engine.
18. Establish assemblage of an air cleaner with an air inlet sleeve.
19. Having replaced lock rings, plant power shafts in transmission. Screw a bolt of fastening of the basic bearing of the left shaft and tighten it with demanded effort (45 H•м).
20. Plant in assemblage of a rotary fist a tip of steering draught and a spherical support of the bottom lever of a suspension bracket. Tighten корончатые nuts of spherical fingers with demanded effort (60 ÷ 72 H•м: a support and 30 H•м: a tip). Block nuts new | | |