Mitsubishi Galant

1990-2001 of release

Repair and car operation



Mitsubishi Galant
+ Identification numbers of the car
+ Controls
+ Options and routine maintenance
+ The engine
- Cooling and heating systems
   Specifications
   Antifreeze - the general data
   Check of serviceability of functioning and the thermostat
   Check of a condition of the fan of system of cooling
   Removal and installation of a radiator of system of cooling
   Check of a condition of the water pump
   Removal and installation of the water pump
   Check of serviceability of functioning and replacement of the block of the gauge of a measuring instrument of temperature of a cooling liquid
   Replacement of the electromotor of a drive of the fan of a heater
   Removal and installation of the heat exchanger of a heater
   Check of serviceability of functioning and service of systems of heating and air conditioning
   Removal and installation of assemblage of the control panel by functioning of a heater and air conditioner, adjustment приводных cables
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Manual transmission
+ Coupling and transmission a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Replacement of the electromotor of a drive of the fan of a heater

Details of installation of the fan of a heater on models Mirage 1990 ÷ 1992 of вып.

1 — the Ware box
2 — a loudspeaker Lattice
3 — the Forward overlay of a door threshold (model with a right-hand steering)
4 — the Knee emphasis (models with a right-hand steering)
5 — the Assembly frame of a ware box
6 — Knee (models without a back heater) / line (models with a back heater) an air line
7 — an electroconducting Socket приводного the fan motor
8 — the Hose

9 — the Block of management of system of the distributed injection (MPI)
10 — Вентиляторная assemblage
11 — a fan Casing
12 — the Sealing lining
13 — a fastening Nut крыльчатки
14 — Крыльчатка
15 — Приводной the electromotor


Details of installation of the fan of a heater on models Mirage 1993 ÷ 1996 of вып.

1 — Section of the bottom furnish
2 — the Ware box
3 — the Panel of angular furnish

4 — the Assembly frame of a ware box
5 — Resistive assemblage
6 — Assemblage of the fan of a heater with приводным the motor


Details of installation of the fan of a heater on models Mirage 1997 ÷ 2000 of вып.

1 — Resistive assemblage
2 — Assemblage of the fan of a heater with приводным the electromotor
3 — the Panel of devices

4 — the Connecting sleeve (models without К/В)
5 — the Evaporator (models with К/В)
6 — a fan Casing


Details of installation of the fan of a heater on models Galant 1990 ÷ 1993 of вып.

1 — the Persistent clamp
2 — the Ware box
3 — the Panel of the bottom furnish
4 — the Sleeve of giving of air in foot wells
5 — Sockets of electroconducting of the relay of management MFI and the gauge-switch of illumination of a ware box
6 — the Assembly frame of a ware box
7 — the Forward overlay of a door threshold
8 — the engine management Module
9 — evaporator Fixture (models with К/В)/clamps of fastening of an air line (model without К/В)

10 — the Hose
11 — Assemblage of the fan with a casing
12 — Приводной the electromotor
13 — the Sealing lining
14 — a fastening Nut крыльчатки
15 — Крыльчатка
16 — Assemblage of the fan with приводным the motor
17 — a fan Casing


Details of installation of the fan of a heater on models Galant 1994 ÷ 1998 of вып.

1 — the Panel of the bottom furnish
2 — Resistive assemblage
3 — ECM compressor K/V (model with К/В)
4 — Assemblage of the fan of a heater
5 — the Panel of devices

6 — the Clamp
7 — the Connecting sleeve (models without К/В)
8 — evaporator Fixture (models with К/В)
9 — a fan Casing



Details of installation of the fan of a heater on models Diamante 1992 ÷ 1996 of вып.

1 — the Panel of the bottom furnish
2 — the Sleeve of giving of air in foot wells
3 — the Assembly frame of a ware box
4 — evaporator Fixture
5 — Assemblage of the motor of switching of a mode of circulation
6 — the Relay of management MFI

7 — the Block of management MFI
8 — the Right bottom arm of the panel of devices
9 — Assemblage of the fan of a heater with a casing
10 — Assemblage of the fan of a heater
11 — a fan Casing


Details of installation of the fan of a heater on models Diamante 1997 ÷ 2000 of вып.

1 — the blocking Controller приводного belt К/В
2 — Assemblage of the fan of a heater

3 — the Relay of a high-speed mode of functioning of the fan of a heater


Cars considered in the present Management are equipped by system of the additional safety SRS more known as a pillow of safety. Before to perform any works near to assemblage of a pillow or a steering column, without fail disconnect system in order to avoid reception of traumas as a result of its casual operation, - disconnect from the battery at first negative, then for a positive wire and wait not less than two minutes before to start service of the components located near to gauges of directed overloads (the Onboard electric equipment see the Head). Isolation and contact sockets of electroconducting of chain SRS are painted in bright yellow colour. It is not necessary to connect any diagnostic devices to the given chain!


Models Mirage

Removal

 PERFORMANCE ORDER

1. Details of installation of the fan of a heater on models Mirage are shown on illustrations.
2. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

3. Remove the right section of the bottom furnish of the panel of devices (the Body see the Head).
4. Remove assemblage of a ware box and its assembly frame (the Body see the Head).
5. Disconnect electroconducting from приводного the motor of the fan of a heater.
6. Disconnect and remove resistive assemblage.
7. Disconnect a ventilating tube приводного the electromotor.
8. Turn out fixing bolts and remove to the block приводного the motor. In case of need replace крыльчатку the fan.


Installation

 PERFORMANCE ORDER

1. Establish assemblage приводного the electromotor on the regular place and screw fixing bolts.
2. Connect to the motor electroconducting.
3. Connect a ventilating tube.


Models Galant 1993 ÷ 1993 of вып.

Removal

 PERFORMANCE ORDER

1. Details of installation of the fan of a heater on models Galant 1990 ÷ 1993 of вып. Are shown on an illustration.
2. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

3. Remove a clamp of a ware box.
4. Against the stop open a cover of a ware box and turn out the bottom screws of fastening of assemblage. Remove a ware box.
5. Remove the right section of the bottom furnish of the panel of devices (the Body see the Head).

Pay attention, that some of fixing screws are closed by decorative covers which are preliminary necessary for removing.

6. Remove a sleeve of giving of air in a foot well of the forward passenger.
7. Disunite a 10-contact socket on the back party of an assembly frame of a ware box. Disconnect electroconducting from the gauge-switch of illumination of a box (also it is established on an assembly frame).
8. Turn out four fixing bolts and remove an assembly frame of a ware box.
9. Disconnect the small air hose going from the electromotor of the fan to a casing of the fan.
10. Disconnect electroconducting from приводного the motor.
11. Turn out three fixing bolts and remove assemblage of the fan from a casing. In case of need give a nut and remove крыльчатку.


Installation

 PERFORMANCE ORDER

1. Attentively examine a casing from within, having removed from it dust and the extraneous subjects, capable to place to rotation крыльчатки.
2. Estimate a condition of a sealing lining, in case of need make replacement.
3. Establish the heater fan on the regular place. Screw and tighten fixing bolts.
4. Connect to приводному to the motor a ventilating hose and electroconducting.
5. Establish an assembly frame of a ware box and connect to it both electric sockets (10-contact and 1-contact).
6. Establish an air line.
7. Establish section of the bottom furnish of the panel of devices, - track correctness of installation and reliability защелкивания all clamps.
8. Establish a ware box with a persistent clamp.
9. Connect a negative wire to the battery.


Models Galant 1994 ÷ 2000 of вып.

Removal

 PERFORMANCE ORDER

1. Details of installation of the fan of a heater on models Galant 1994 ÷ 2000 of вып. Are shown on illustrations.
2. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

3. Turn out three fixing screws and remove the bottom section of furnish of the panel of devices (the Body see the Head).
4. On the models equipped with a central air of air remove the compressor module.
5. Disconnect electroconducting from the electromotor of a drive of the fan of a heater.
6. Turn out three fixing screws and remove вентиляторную assemblage from a casing.


Installation

 PERFORMANCE ORDER

1. Attentively examine a casing from within, having removed from it dust and the extraneous subjects, capable to place to rotation крыльчатки.
2. Establish the heater fan on the regular place. Screw and tighten fixing bolts.
3. Connect to приводному to the motor electroconducting.
4. At a corresponding complete set of the car establish compressor K/V module.
5. Establish section of the bottom furnish of the panel of devices, - track correctness of installation and reliability защелкивания all clamps.
6. Connect a negative wire to the battery.


Models Diamante

Removal

 PERFORMANCE ORDER

1. Details of installation of the fan of a heater on models Diamante are shown on illustrations.
2. Disconnect safety pillows (the Onboard electric equipment see the Head).
3. Remove the right section of the bottom furnish of the panel of devices and an air line sleeve.
4. Remove the drummer of the lock of a ware box, assemblage of a ware box and its external casing. Turn out the screw located under assemblage.
5. Give fixture of a casing of the evaporator.
6. Remove assemblage of the motor of switching of a mode of circulation.
7. Remove РСМ, a basic arm and the relay of management MFI.
8. Remove the right bottom arm of the panel of devices.
9. Disconnect from вентиляторной assemblages a cast hose.
10. Remove fan assemblage.
11. In case of need give a fixing nut and remove крыльчатку.


Installation

 PERFORMANCE ORDER

1. Check up a shaft приводного the pump on presence of signs of a bend. Estimate a condition of a sealing lining. Carefully clear all details of assemblage, blow an air line.
2. Fix крыльчатку the fan on a shaft приводного the pump.
3. Establish assemblage on the regular place.
4. Connect to the motor a cast hose and electroconducting.
5. Screw a bolt of fastening of a casing of the evaporator.
6. Establish the right bottom arm of the panel of devices.
7. Establish РСМ, a basic arm and the relay of management MFI.
8. Establish assemblage демпферного the motor of switching of a mode of circulation.
9. Screw located under assemblage of a ware box the screw, then establish a ware box, - operate in an order, the return to an order of dismantle of components.
10. Establish the bottom section of furnish of the panel of devices/sleeves of an air line.
11. Connect a negative wire to the battery. Check up serviceability of functioning of an automatic central air of air (climate control).