Mitsubishi Galant

1990-2001 of release

Repair and car operation



Mitsubishi Galant
+ Identification numbers of the car
+ Controls
+ Options and routine maintenance
+ The engine
+ Cooling and heating systems
+ The power supply system and release
+ Engine electric equipment
+ Control systems of the engine
- Manual transmission
   + 5-step manual box of a gear change (РКПП)
   + Automatic transmissions (АТ)
   - Distributing box
      The general information
      Replacement of a back epiploon of a distributing box
      Removal and installation of the lever of a distributing box
+ Coupling and transmission a line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of the lever of a distributing box

Removal

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

2. Поддомкратьте the car also establish it on props. Merge from a distributing box oil.
3. Disconnect from a final collector a reception pipe of system of release of the fulfilled gases.
4. Отболтите a distributing box and accurately remove it with back карданного a shaft, - try not to damage planted in a casing of a target compartment an epiploon. At once tie up the free end карданного a shaft a wire to frame elements.
5. Закупорьте apertures in a box and crankcase transmissions for the purpose of minimisation of losses трансмиссионного oils and in order to avoid hit in dirt components.


Installation

 PERFORMANCE ORDER

1. Grease a sliding collar карданного a shaft and an epiploon sponge in a casing of lengthening of a distributing box. Establish a box on transmission. In the course of connection to a box карданного a shaft try not to damage an epiploon.
2. Tighten bolts of fastening of a distributing box with demanded effort (55 ÷ 60 H•м: for models with РКПП and 60 ÷ 80 H•м: for models with АТ).
3. Having replaced a sealing lining, connect a reception pipe to a final collector.
4. Establish into place all components acting in film for the purpose of providing of access.
5. Fill in fresh трансмиссионное oil in a distributing box and transmission (see the Head of Adjustment and routine maintenance).